Link to Details about David Childs

 

Bridge Design & Assessment

Google

You are here: Home » Resources » Bridge Pictures » Cheriton Interchange Bridges

Scroll to top

 

CHERITON INTERCHANGE BRIDGES
 

*

Designed in 1976

*

Built in 1979/80

*

Strengthened
before it was built


Cheriton Interchange Bridges have two span reinforced concrete bridge decks on reinforced concrete cantilever abutments and centre piers. The bridges were designed for HA and 37.5 units of HB loading to BE 5/73 & BS 153:Part 3A:1972. Reinforced concrete was designed in accordance with CP114 and BE 1/73(1st Revision). In 1978 the Central Electricity Generating Board requested that the west bridge be strengthened to carry a 450 tonne vehicle on 14 axles or 425 tonne vehicle on 12 axles. This modification was incorporated into the design before the Bridge was built.


Return to Bridge Pictures