Link to Details about David Childs

 

Bridge Design & Assessment

Google

You are here: Home » Bridge Design » Calculations

Scroll to top

 

Bridge Design Calculations

 

These examples of bridge design calculations are based on BS 5400 and the Design Manual for Roads and Bridges. Examples to the Eurocodes, BS EN 1990 to 1997 and the UK National Annex, will be introduced as and when their use is required.
The design calculations are in .pdf format and they will be emailed to you in a zip folder. We receive notification from PayPal when your transaction is complete, but please allow one working day for processing your purchase.

 
Legal Stuff - Please Read.....[Show]

Disclaimer

Examples have been prepared to illustrate the design principles for a reinforced concrete bridge deck on reinforced concrete abutments and pier to suit a hypothetical set of conditions. Users of these examples should verify for themselves the appropriateness of any parts of the examples which they use for their own bridge designs and their own particular conditions, and should check for themselves the correctness of any calculations that they copy. David Childs has prepared these documents to assist designers, but he takes no responsibility for how the examples are used.
 

Consumer Protection

Please ensure that you are purchasing the correct document as they cannot be returned.
The documents conform with clause 13(1)(c) of the Consumer Protection (Distance Selling) Regulations 2000 as being an 'Exception to the right to cancel'.
 

Proof of Purchase

Documents that are purchased will be licensed to the email address used for procurement through PayPal; any enquiries about the items purchased must be sent using this licensed email address.
There are no administration costs or VAT included in the price of the documents therefore the PayPal receipt is satisfactory for the proof of purchase. If an invoice is required then an administration charge of £15 GBP will have to be added. Click here to link to Administration Fee WebPage.

... close

 

*

Two Span Reinforced Concrete Bridge Deck to BS 5400
 

Design calculations for a hypothetical two span reinforced concrete bridge deck to illustrate the requirements of BS 5400 Part 2 loading and Part 4 for design of concrete bridges. A grillage analysis is undertaken; input load cases and output results are included. The example also demonstrates how spreadsheets can be used effectively to reduce the design time taken with the repetative calculations.


Price: £20.00 GBP

A1.zip
Version 1.01

 

*

Reinforced Concrete Substructure for a Two Span Bridge Deck to BS 5400
 

Design calculations for reinforced concrete abutments, wing walls and pier of a hypothetical two span bridge deck to illustrate the requirements of BS 5400 Part 2 loading and Part 4 for design of concrete bridges. Loading from the superstructure has been taken from the Reinforced Concrete Bridge Deck Example. The example also demonstrates how spreadsheets can be used effectively to reduce the design time taken with the repetative calculations.


Price: £20.00 GBP

A2.zip
Version 1.01

 

*

Two Span Reinforced Concrete Deck & Substructure to BS 5400
 

 
Documents A1 and A2 may be purchased together for a reduced price.

 
Price: £35.00 GBP

A1.zip & A2.zip
Version 1.01

 

 

 

PayPal Acceptance Mark

 
For more information:

Contact David Childs